The difference between a block that hands over on time and one that does not is rarely the building work. It is whether anybody can say, per unit, exactly what is left.

Per unitgates and certificate
Schedule importExcel, CSV or PDF
Unit typesrooms carried through
64 flatsin the worked example
projectauditpro.com/app
Riverside Court
Dashboard
Drawings
Snagging7
Inspections3
NCRs2
Fire stopping
Handover
Reports

Handover readiness

Certificate
Flat 12 · 2 bedrooms
Clear to sign once snagging closes
Not ready
✓
Inspections signed off
Every applicable inspection complete and signed.
!
Snagging complete
2 items still open against this unit.
✓
No open non-conformances
Nothing outstanding.
✓
Fire stopping verified
All 6 penetrations verified and evidenced.
Checklist19 items — 17 completeSignaturesPrincipal contractor and client, on the deviceCertificateBranded PDF, with what was outstanding on it

Set-up

The schedule of areas does the work

Import it once

Every flat created with its type, rooms, floor area and balcony area — so a location is a real place and a snag lands in a room that exists.

Or generate it

Identical units on repeating floors built in one step where there is no schedule to import.

Check it against the drawing

Totals compared to the schedule, so a transposed figure is caught now rather than at handover.

Through the block

One process, sixty-four times

1

Every unit answers for itself

Four gates calculated from the live registers. A unit is ready when they say it is, and the dashboard counts how many are clear to sign.

projectauditpro.com/app
Riverside Court
Dashboard
Drawings
Snagging7
Inspections3
NCRs2
Fire stopping
Handover
Reports

Handover readiness

Certificate
Flat 12 · 2 bedrooms
Clear to sign once snagging closes
Not ready
✓
Inspections signed off
Every applicable inspection complete and signed.
!
Snagging complete
2 items still open against this unit.
✓
No open non-conformances
Nothing outstanding.
✓
Fire stopping verified
All 6 penetrations verified and evidenced.
Checklist19 items — 17 completeSignaturesPrincipal contractor and client, on the deviceCertificateBranded PDF, with what was outstanding on it
2

The same register, unit by unit

Snags raised against the flat they are in, pinned on that flat’s own plan, and issued to the trade that owns them.

projectauditpro.com/app
Riverside Court
Dashboard
Drawings
Snagging7
Inspections3
NCRs2
Fire stopping
Handover
Reports

Snagging & defects register

+ New snagExcelPDF
Open 38In progress 9Fixed – to check 21Closed 16
RefLocationDescriptionStatus
SNG-041Flat 12 · Kitchen
Moderate
Worktop join at the sink run is open and unsealedOpen
SNG-040Flat 12 · Hallway
Minor
Architrave mitre open at the head of the doorIn progress
SNG-039Level 02 · Corridor
Significant
Emergency light not illuminating on testOpen
SNG-038Flat 09 · Bathroom
Moderate
Silicone to bath edge cracked along the full runFixed
SNG-037Flat 09 · Bedroom 1
Minor
Skirting scribed short at the external cornerIn progress
SNG-036Level 01 · Riser
Moderate
Access panel fixings missing, two of fourOpen
  • Snag unit by unit, pinned on that unit’s own floor plan
  • Inspections run per work package and recorded against the units they cover
  • A failed line escalates to a non-conformance rather than being discovered afterwards
  • Fire stopping evidenced in the risers and ceilings before they are closed
  • Each unit’s four gates calculated live — no unit is “probably ready”
  • A handover certificate per unit, with what was outstanding written on it

The dashboard answers the only question the sales office actually asks: how many are clear to sign, and what is holding the rest up.

After occupation

The defects-liability list is the same list

Items that come back from the purchaser or the management company go against the same unit, with the same trades and the same two-stage close. You are not running a second, parallel job in a different spreadsheet with different location names.

FAQ

Questions housebuilders ask

We hand over in blocks of twenty. Does that work?

Yes. Handover is per unit, so a block is twenty units each with their own gates, checklist and certificate — and the dashboard shows how many are clear to sign.

Can we generate the units from a schedule?

Import the schedule of areas from Excel, CSV or PDF and every flat is created with its type, rooms, floor area and balcony area. Sixty-four flats in one go, or generate identical units where the schedule does not exist.

What about the defects that come back after occupation?

They go on the same register, against the same unit, with the same two-stage close — so the liability-period list is not a second parallel job.

Sixty-four flats are already loaded

The worked example is a real residential block at every stage of readiness — open it and see what your own would look like.