Guides

Written from site, not from a brochure

Short, practical pieces on the paperwork the job actually demands — what to record, when to record it, and what happens if you do not.

CDM 2015what has to be recorded
Golden threadin practice
Snagging listshow to write one
Freeno sign-up to read
projectauditpro.com/app
Riverside Court
Dashboard
Drawings
Snagging7
Inspections3
NCRs2
Fire stopping
Handover
Reports

Reports & exports

Issue by trade
Snagging register
Everything matching your filters, with a photographs appendix.
PDFExcel
Fire stopping pack
Every penetration, before and after, as one document.
PDFEmail
Quality summary
What a client or an NHBC surveyor asks for, in one.
PDFPrint

Issue to subcontractors

Send all
One email each, with only their own items and the photographs.
Cotswold Joinery14 open1 overdueEmail
MK Electrical Services10 open—Email
Riverside Tiling7 open2 overdueEmail
Lakeside Plumbing5 open—Email
Sealtec Fire Protection4 open1 overdueEmail

The tool behind the guides

Everything described in these pieces is what Project Audit Pro was built to record.