Snagging & defects

Snagging that closes, not a spreadsheet that grows

Drop a pin on the real drawing, photograph the defect, assign it to the trade and give it a date. The trade marks it fixed; you verify it on site and close it. Nothing gets typed twice and nothing gets lost between the walk round and the meeting.

2-stageclose, not by the fixer
PDF + Excelbranded, on device
Offlinequeues and syncs
Per itemfull dated history
projectauditpro.com/app
Riverside Court
Dashboard
Drawings
Snagging7
Inspections3
NCRs2
Fire stopping
Handover
Reports

Snagging & defects register

+ New snagExcelPDF
Open 38In progress 9Fixed – to check 21Closed 16
RefLocationDescriptionStatus
SNG-041Flat 12 · Kitchen
Moderate
Worktop join at the sink run is open and unsealedOpen
SNG-040Flat 12 · Hallway
Minor
Architrave mitre open at the head of the doorIn progress
SNG-039Level 02 · Corridor
Significant
Emergency light not illuminating on testOpen
SNG-038Flat 09 · Bathroom
Moderate
Silicone to bath edge cracked along the full runFixed
SNG-037Flat 09 · Bedroom 1
Minor
Skirting scribed short at the external cornerIn progress
SNG-036Level 01 · Riser
Moderate
Access panel fixings missing, two of fourOpen

The problem

A list is not a system

Most snagging still runs on a spreadsheet and a camera roll. The list grows, the photographs live somewhere else, nobody can say which items are genuinely closed, and the trade argues about what “hallway, second floor” meant. The week before handover, somebody rebuilds the whole thing by hand.

1

Pinned where it actually is

Upload the floor plan as a PDF and drop the pin on the spot. Pinch to zoom, pan freely — the pin stays exactly where you put it, at any zoom, and the register and the drawing are the same record seen two ways.

projectauditpro.com/app
Riverside Court
Dashboard
Drawings
Snagging7
Inspections3
NCRs2
Fire stopping
Handover
Reports

Level 02 — General arrangement

SnagInspectionNCR
2

A register, not a spreadsheet

Severity, priority, subcontractor and a target date on every item. Filter it, sort it, group it by trade — and the register tells you what is overdue and who owes it rather than you working it out.

projectauditpro.com/app
Riverside Court
Dashboard
Drawings
Snagging7
Inspections3
NCRs2
Fire stopping
Handover
Reports

Snagging & defects register

+ New snagExcelPDF
Open 38In progress 9Fixed – to check 21Closed 16
RefLocationDescriptionStatus
SNG-041Flat 12 · Kitchen
Moderate
Worktop join at the sink run is open and unsealedOpen
SNG-040Flat 12 · Hallway
Minor
Architrave mitre open at the head of the doorIn progress
SNG-039Level 02 · Corridor
Significant
Emergency light not illuminating on testOpen
SNG-038Flat 09 · Bathroom
Moderate
Silicone to bath edge cracked along the full runFixed
SNG-037Flat 09 · Bedroom 1
Minor
Skirting scribed short at the external cornerIn progress
SNG-036Level 01 · Riser
Moderate
Access panel fixings missing, two of fourOpen
3

In your hand, on the floor you are standing on

The same register on a phone, with the item you are looking at open in front of you. Raise it, photograph it and assign it without going back to the office.

Project Audit Pro
SNG-041Moderate
Flat 12 · Kitchen
Worktop join at the sink run is open and unsealed.
OpenPDFEmail
SNG-040Minor
Flat 12 · Hallway
Architrave mitre open at the head of the door.
OpenPDFEmail
+ Snag

What the register guarantees

0stages to close an item
0registers that pass through an outside service
0formats out: PDF, Excel, CSV
0of changes dated and named

How it runs

From the walk round to the closed item

1

Set the units up

Import the schedule of areas and every flat is created with its type, rooms and floor areas — so a location is a real place, not free text.

2

Walk and pin

Drop the snag on the drawing, photograph it, pick the trade and the severity.

3

Issue by trade

Everything outstanding grouped by subcontractor, out as one email with one PDF.

4

Verify and close

The trade marks it fixed. You check it on site and close it. Both stages are stamped with a date and a name.

What you get out

Paperwork the client will accept

  • A branded PDF register with a photographs appendix, filtered however you like
  • Excel and CSV for the QS, with every field the register holds
  • One combined document per trade, one item per page, ready to send
  • A full history on every item: who changed what, and when
  • Everything generated on your own device
Snagging Register.pdf
Snagging RegisterRiverside Court · RC-2 · Meridian Homes
Filtered onOpen and in progress
Items38
RefLocationStatus
SNG-041Flat 12 · KitchenOpen
SNG-040Flat 12 · HallwayIn progress
SNG-039Level 02 · CorridorOpen
SNG-038Flat 09 · BathroomFixed
SNG-037Flat 09 · Bedroom 1In progress
Photographs appendix follows — 24 images, one page per item.
Fenner ConstructionRiverside CourtPage 1 of 12

FAQ

Straight answers

What is a snagging list?

A snagging list is the record of everything that is not right yet — the defects, the unfinished work and the damage found on a walk round, each one tied to a place, a trade and a date it has to be put right by. On a housing job it is usually produced unit by unit before handover, and again at the end of the defects liability period.

Does it work without a signal?

Yes. Records and photographs are held on the device and go up the moment you are back in range. Basements and shell floors are exactly where snagging happens, so it has to.

Can subcontractors see their own items?

They get one email with one PDF listing everything outstanding against them, with photographs. There is no seat to buy and nothing for them to install — most trades will not download an app, and a PDF is what they already act on.

Who can close an item?

The trade marks it fixed; you check it on site and close it. An item is never closed by the party that fixed it, and every status change is stamped with a date and a name.

Start with the worked example

A real 64-flat project is loaded for you — 60 snags, 49 inspections, six NCRs — so you can see how it behaves before you put your own job in.