Who it’s for

For principal contractors

You carry the duty to plan, manage and monitor the construction phase — and the duty to be able to show it. This was built by somebody carrying the same duty, on his own sites.

CDM 2015shaped around the duties
BSA readygolden thread built in
One appfive registers
Your teamone set of projects
projectauditpro.com/app
Riverside Court
Dashboard
Drawings
Snagging7
Inspections3
NCRs2
Fire stopping
Handover
Reports
0Open snags54 raised in total
0Overduepast target date
0To verifytrade says fixed
0Open NCRs1 critical

Open snags by trade

Joinery
0
M&E
0
Plastering
0
Tiling
0
Decoration
0

Inspections

Open
Signed off
0
In progress
0
Failed items
0

The duty

Plan, manage, monitor — and be able to show it

The awkward part of the role is rarely the management. It is that eighteen months later somebody asks what was checked in a riser that is now behind two layers of board, and the answer lives in a phone that has been replaced.

Monitoring that leaves a record

Every walk-round observation tied to a place, a trade, a date and an outcome — and visibly open or closed.

Inspection evidence

Fifteen ITPs and sixteen trade check sheets, every acceptance criterion written out, every result recorded with the inspector and the date.

Results, not attendance

Every line recorded pass, fail or not applicable, with the inspector, the date and a photograph — not a signed cover sheet over unrecorded lines.

Non-conformances

Disposition, root cause and verified close-out — the record a concession needs to be defensible.

Evidence before cover-up

Fire stopping photographed before and after, with the certified system and the label.

A handover you can defend

Four calculated gates, both signatures, and what was outstanding written on the certificate.

On the job

The three screens the week actually runs on

1

The register you walk with

Pin it, photograph it, assign it, date it. Twenty minutes on the floor rather than an evening typing it up afterwards.

projectauditpro.com/app
Riverside Court
Dashboard
Drawings
Snagging7
Inspections3
NCRs2
Fire stopping
Handover
Reports

Snagging & defects register

+ New snagExcelPDF
Open 38In progress 9Fixed – to check 21Closed 16
RefLocationDescriptionStatus
SNG-041Flat 12 · Kitchen
Moderate
Worktop join at the sink run is open and unsealedOpen
SNG-040Flat 12 · Hallway
Minor
Architrave mitre open at the head of the doorIn progress
SNG-039Level 02 · Corridor
Significant
Emergency light not illuminating on testOpen
SNG-038Flat 09 · Bathroom
Moderate
Silicone to bath edge cracked along the full runFixed
SNG-037Flat 09 · Bedroom 1
Minor
Skirting scribed short at the external cornerIn progress
SNG-036Level 01 · Riser
Moderate
Access panel fixings missing, two of fourOpen
2

The evidence that survives the ceiling going in

One record per penetration, photographed before and after, with the certified system and the label — while the seal is still reachable.

projectauditpro.com/app
Riverside Court
Dashboard
Drawings
Snagging7
Inspections3
NCRs2
Fire stopping
Handover
Reports

FS-018 — Riser penetration

Evidence pack
BarrierLevel 02 riser wall — EI 120Services2 × 50mm steel, 1 × cable traySystemCertified batt & mastic, ref CS-118InstallerMK Electrical · 04 Sep
4 of 5 evidence itemsEvidence gap
3

The document that ends the argument

Branded, dated, carrying the photographs, and generated on the device in your hand.

Quality Summary.pdf
Snagging RegisterRiverside Court · RC-2 · Meridian Homes
Filtered onOpen and in progress
Items38
RefLocationStatus
SNG-041Flat 12 · KitchenOpen
SNG-040Flat 12 · HallwayIn progress
SNG-039Level 02 · CorridorOpen
SNG-038Flat 09 · BathroomFixed
SNG-037Flat 09 · Bedroom 1In progress
Photographs appendix follows — 24 images, one page per item.
Fenner ConstructionRiverside CourtPage 1 of 12

A working week

What it looks like between Monday and Friday

1

Monday

Walk the floor that came out of first fix. Pin what is wrong, photograph it, assign it. Twenty minutes, not an evening of typing up.

2

Tuesday

Issue by trade. Each subcontractor gets one email, one PDF, their own items.

3

Wednesday

Inspections on the next work package, recorded where the work is and pinned on the drawing.

4

Thursday

Verify what came back marked fixed. Close what is genuinely closed; reject what is not, with a photograph.

5

Friday

Export the quality summary for the progress meeting. Nobody rebuilds anything by hand.

What you can produce on demand

Without a week of preparation

  • Every inspection on a work package, with its acceptance criteria and results
  • Every inspection still unsigned, and what is outstanding on it
  • Every defect against a unit, with photographs and both close-out signatures
  • Every fire stopping penetration, with the evidence attached to it
  • Every non-conformance with its root cause and what verified the fix
  • A handover certificate stating exactly what was outstanding when it was signed

FAQ

Questions principal contractors ask

Does it replace our construction phase plan?

No. It records the monitoring and the inspection evidence that the plan says you will carry out — the part that is usually done properly and recorded badly.

Can our client see it?

They see what you send them: branded PDFs, Excel registers and a quality summary. There is no client login to administer and no half-finished register on show.

We work with the same trades on every job. Does that help?

Yes — the subcontractor list, the check sheets and the unit types carry across, so the second project is set up in an afternoon.

Built on a live site, not in a workshop

Every register in it exists because a job needed it. Fourteen days free, no card, with a real worked example loaded.