Handover

A unit is ready when the registers say it is

Not when somebody thinks it is. Four gates are calculated from the live registers — inspections, snags, non-conformances and fire stopping — and only then do the checklist and the signature matter.

4gates, calculated
19checks a unit
2signatures
1 PDFcertificate out
projectauditpro.com/app
Riverside Court
Dashboard
Drawings
Snagging7
Inspections3
NCRs2
Fire stopping
Handover
Reports

Handover readiness

Certificate
Flat 12 · 2 bedrooms
Clear to sign once snagging closes
Not ready
✓
Inspections signed off
Every applicable inspection complete and signed.
!
Snagging complete
2 items still open against this unit.
✓
No open non-conformances
Nothing outstanding.
✓
Fire stopping verified
All 6 penetrations verified and evidenced.
Checklist19 items — 17 completeSignaturesPrincipal contractor and client, on the deviceCertificateBranded PDF, with what was outstanding on it

The four gates

Calculated from the live registers, not ticked by hand

Inspections signed off

Every inspection that applies to the unit is complete and signed.

Snagging complete

Every snag against the unit is verified closed, not just marked fixed.

No open NCRs

No non-conformance against the unit is outstanding.

Fire stopping verified

Every penetration in the unit is verified and evidenced.

In practice

Sixty-four units, each one answering for itself

1

The gates do the arguing

You cannot mark a gate passed by hand. If the registers say two snags are open against the unit, the gate is open — whatever the programme says, and whoever is asking.

projectauditpro.com/app
Riverside Court
Dashboard
Drawings
Snagging7
Inspections3
NCRs2
Fire stopping
Handover
Reports

Handover readiness

Certificate
Flat 12 · 2 bedrooms
Clear to sign once snagging closes
Not ready
✓
Inspections signed off
Every applicable inspection complete and signed.
!
Snagging complete
2 items still open against this unit.
✓
No open non-conformances
Nothing outstanding.
✓
Fire stopping verified
All 6 penetrations verified and evidenced.
Checklist19 items — 17 completeSignaturesPrincipal contractor and client, on the deviceCertificateBranded PDF, with what was outstanding on it
2

Then the checklist, then the signatures

Nineteen checks in four groups: the unit, the services, the documents, and the building safety items. Two signatures, and the certificate is ready before you have left the flat.

Handover Certificate.pdf
Handover CertificateFlat 12 · Riverside Court
UnitFlat 12 · 2 bedrooms
Inspections signed off9 of 9
Snagging2 open at handover
Non-conformancesNone open
Fire stopping6 penetrations verified
Golden threadRecord handed over
Principal contractorM. Fenner · 08 Sep
Client representativeAwaiting signature
Fenner ConstructionRiverside CourtPage 1 of 3

What a handover carries

0gates, calculated live
0checks a unit, in four groups
0signatures on the certificate
0units in the worked example

The checklist

Nineteen checks, in four groups

  • The unit itself — finishes, doors, ironmongery, glazing, floor coverings
  • The services — commissioned, tested, certificates in hand
  • The documents — O&M, warranties, keys and meter readings
  • Building safety — on a higher-risk building, the golden thread item for every unit
  • Anything still outstanding, written on the certificate rather than agreed verbally

FAQ

Straight answers

What are the gates?

Five checks the app runs against the live registers before a unit can be signed over: every applicable inspection signed off, all snags verified closed, no non-conformances outstanding, and fire stopping verified and evidenced. They are calculated, not ticked — you cannot mark a gate passed by hand.

What is on the checklist?

Nineteen checks in four groups, covering the unit itself, the services, the documents and the building safety items. On a higher-risk building it includes a golden thread item for every unit.

What does the client get?

A handover certificate with both signatures, the checklist, the gate results and the outstanding items agreed at the point of signing — as one branded PDF.

Can a unit be signed over with items outstanding?

It can, if that is what was agreed — but the outstanding items are written on the certificate rather than left to memory, and the gates still show what was not met.

See a unit that is clear to sign

The worked example has sixty-four flats at every stage of readiness, and the gates behave exactly as they would on your own job.